• Licensed C-11855 · CUC041521
  • Family owned since 1978
  • We own the transfer station
  • Serving 4 Tampa Bay counties

Pinellas County

Demolition contractor serving Madeira Beach, FL

Licensed C-11855 and CUC041521, working out of our own yard in Clearwater — about 30 minutes away.

30 minutesfrom our yard to Madeira Beach
Since 1978family owned and operated
Own yarddebris crushed, not subcontracted

Like its island neighbors, Madeira Beach is in a demolish-and-elevate cycle: surge-damaged homes coming down for new elevated construction, plus commercial turnover around John's Pass. Tight lots and tourist traffic make containment and quick haul-off the visible measure of a demolition crew here.

1950s–60s ground-level beach and canal homes, older commercial around John's Pass Village, and small mid-century motels along Gulf Boulevard — a stock that flooded broadly in Helene.

We work across Madeira Beach and the surrounding Pinellas County area, including John's Pass, Crystal Island, Boca Ciega Drive area and Gulf Boulevard corridor.

Thirty minutes from the yard, in-county, no tolls — down Seminole Boulevard and across the Madeira causeway. Fast cycles back to our own transfer station keep debris from ever stockpiling on lots with no room for it.

The debris from your job goes to our gate, not a competitor’s. We operate the C&D transfer station at the Keene Rd yard, which is why disposal shows up on our quotes as a cost rather than a margin someone else sets — and why the concrete leaves as base material rather than as landfill.

Red Sarnago roll-off container tipping demolition debris inside the covered transfer station, a sorted pile behind and a worker in hi-vis beside the truck
Inside our own C&D transfer station at the Keene Rd yard — where the debris from your job actually goes.

Permits

Demolition permitting in Madeira Beach

The City of Madeira Beach issues its own demolition permits, with flood-zone substantial-damage review shaping most current applications after the 2024 storm surge ran through the city. The asbestos survey and 10-working-day NESHAP notice apply to all the original stock, and staging on the narrow Gulf Boulevard corridor is coordinated with the city.

Services

What we take down in Madeira Beach

House Demolition in Madeira Beach

House demolitions here follow the same gate sequence — survey, disconnects, permit — and the debris still comes back to our own yard rather than a subcontracted landfill run.

What drives the quote

Pool Removal in Madeira Beach

Pool removals are the most common residential job we quote, and the partial-versus-full decision plays out the same way street by street.

What drives the quote

Commercial in Madeira Beach

Commercial teardowns run through the same survey, notification and permitting gates, and owning our own transfer station keeps the disposal line honest on every one.

What drives the quote

Concrete Removal in Madeira Beach

Driveway and slab removals here feed straight into the crushing operation at our yard, which is why the removal quote and the new base quote can come from the same company.

What drives the quote

Mobile Home in Madeira Beach

Mobile home removals are steady work here, and the title retirement and disconnect steps trip up more owners than the demolition itself.

What drives the quote

Lot Clearing in Madeira Beach

Clearance work here runs parcel by parcel through the same gates — tree ordinance, surveys, disconnects — and ends at a pad built on base crushed from the site’s own concrete.

What drives the quote

Also available

Questions

Madeira Beach demolition FAQs

Are you licensed to do demolition in Madeira Beach?

Yes. We hold C-11855 as a Florida specialty demolition contractor and CUC041521 for underground utility work, and we pull the demolition permit for your Madeira Beach job as part of the contract.

How much does demolition cost in Madeira Beach?

It depends on the structure and the access, not the ZIP code — a detached garage and a two-story house are different jobs before anything local is considered. What moves the number in Madeira Beach specifically is containment and haul-off speed, because the lots are tight and the tourist traffic never stops. We walk the site and give you a firm written figure, free.

Do I need a permit to demolish a structure in Madeira Beach?

The City of Madeira Beach issues its own demolition permits, with flood-zone substantial-damage review shaping most current applications after the 2024 storm surge ran through the city. The asbestos survey and 10-working-day NESHAP notice apply to all the original stock, and staging on the narrow Gulf Boulevard corridor is coordinated with the city.

How quickly can you get to Madeira Beach?

Our yard is at 1741 N Keene Rd in Clearwater, about 30 minutes from Madeira Beach. Thirty minutes from the yard, in-county, no tolls — down Seminole Boulevard and across the Madeira causeway. Fast cycles back to our own transfer station keep debris from ever stockpiling on lots with no room for it.

What happens to the debris?

It comes back to our own C&D transfer station on Keene Rd. Concrete, block and rock get crushed into road base and paver base rather than going to landfill at someone else’s rate.