Residential Demolition in CarrollwoodWhole-House & Structure Removal
- Licensed C-11855 · CUC041521
- Family owned since 1978
- We own the transfer station
- Serving 4 Tampa Bay counties
Carrollwood, FL
Residential Demolition in Carrollwood
Taking down a house is mostly paperwork and disposal — the machine work is two or three days, and everything around it is what decides the price and the timeline. Our yard is about 40 minutes away, and we are licensed C-11855 and CUC041521.
The Carrollwood teardown is a late-1950s lakefront ranch in Original Carrollwood coming down for a much larger rebuild, and it is a careful job before it is a big one: established trees to protect, neighbors close on both sides, and a deed-restricted section whose approvals stack on top of the Hillsborough County permit. The 1970s–80s houses in Carrollwood Village mostly generate pool and addition removals, not teardowns.
Carrollwood's demolition market is the Original Carrollwood teardown: a sixty-year-old ranch on Lake Carroll coming down for a substantially larger rebuild. These are careful jobs — established trees, close neighbors, HOA eyes — plus pool removals and additions coming off throughout the Village.
A residential demolition in Florida runs on a fixed sequence: asbestos survey, utility disconnects, permit, then demolition. The survey comes first because the permit depends on it — every structure needs an asbestos survey before the municipality will issue a demolition permit, whatever its age, and most Tampa Bay housing stock qualifies. If asbestos is found, licensed abatement happens before we touch the building.
Utilities are the other gate. Power, water, sewer and gas have to be disconnected and confirmed by the utility itself, not just switched off at the house. Duke Energy, the water authority and the gas company each work to their own timeline, and we tell you exactly what to order and when so the permit is not sitting idle waiting on a meter pull.

What it costs
What drives a Carrollwood quote
| Scope of job | What drives the number |
|---|---|
| Small house, under 1,200 sq ft | Access, foundation type, and how close neighboring structures sit |
| Typical house, 1,200 – 2,500 sq ft | Square footage, slab versus crawl space, disposal weight |
| Large or two-story house | Volume, structural complexity, and tight-access handwork |
| Asbestos abatement, if found | How much material and where it is — siding is cheaper than sprayed texture |
Every demolition is quoted on site, free. Access, structure and what has to be protected move the number more than square footage does, which is why we walk it rather than price it down the phone.
About 40 minutes — over the Courtney Campbell and up Dale Mabry, or the tolled Veterans Expressway when schedule beats toll cost. We usually run the free route and let the backhaul to our own transfer station carry the economics.
How it works
What a Carrollwood job looks like
Asbestos survey
A licensed inspector surveys the structure. Pre-1981 buildings require this before the municipality will issue a demolition permit.
Disconnects and permit
Power, water, sewer and gas confirmed disconnected by each utility, then the demolition permit is filed with your city or county.
Demolish
The structure comes down in a controlled sequence, with loads sorted as they separate — concrete, metal, wood.
Foundation and slab
Footers and slab are broken out and hauled to our yard for crushing, unless you are keeping the pad.
Grade the lot
The site is filled where needed and graded flat, ready for construction or sale.
Questions
House Demolition in Carrollwood — FAQs
How much does house demolition cost in Carrollwood?
It comes down to the structure and the access, not the ZIP code. On small house, under 1,200 sq ft, what moves the number is access, foundation type, and how close neighboring structures sit. What moves it in Carrollwood is the trees, the neighbors and the HOA — a Lake Carroll teardown is a careful job before it is a big one. We walk the site and quote it, free.
Do I need an asbestos survey before demolition in Florida?
Yes, whatever its age — Florida requires an asbestos survey before a demolition permit is issued, and most municipalities want the survey report with the application. We coordinate the survey as part of the job.
How long does the whole process take?
Plan on three to six weeks from signing to a cleared lot. The survey, utility disconnects and permit take most of that; the demolition itself is usually two to three days.
Who disconnects the utilities?
The utilities do, and they must confirm it — a demolition permit will not close out on a house with a live meter. We tell you exactly what to order from Duke, the water authority and the gas company, and we sequence the job around their lead times.