• Licensed C-11855 · CUC041521
  • Family owned since 1978
  • We own the transfer station
  • Serving 4 Tampa Bay counties

Odessa, FL

Residential Demolition in Odessa

Taking down a house is mostly paperwork and disposal — the machine work is two or three days, and everything around it is what decides the price and the timeline. Our yard is about 35 minutes away, and we are licensed C-11855 and CUC041521.

2–3 daystypical machine time on site
Pre-1981asbestos survey required for permit
Own yarddebris crushed at our transfer station

On Lake Keystone and the chain of lakes, an Odessa house demolition is the original mid-century lake house coming down for a substantially larger new build, with lake access deciding where the excavator sets up and the concrete going back to our yard to be crushed. Wells and septic systems need proper abandonment alongside the utility disconnects, and the parcel’s county decides whether the permit pulls through Pasco or Hillsborough.

Odessa is teardown-and-rebuild country on the lakes — original lake houses coming down for substantial new builds — plus barn and outbuilding demolition on equestrian parcels changing hands. Crushed-concrete driveway base from our yard pairs naturally with acreage jobs here.

A residential demolition in Florida runs on a fixed sequence: asbestos survey, utility disconnects, permit, then demolition. The survey comes first because the permit depends on it — every structure needs an asbestos survey before the municipality will issue a demolition permit, whatever its age, and most Tampa Bay housing stock qualifies. If asbestos is found, licensed abatement happens before we touch the building.

Utilities are the other gate. Power, water, sewer and gas have to be disconnected and confirmed by the utility itself, not just switched off at the house. Duke Energy, the water authority and the gas company each work to their own timeline, and we tell you exactly what to order and when so the permit is not sitting idle waiting on a meter pull.

Two-story coastal house mid-demolition behind Sarnago & Sons site fencing, front wall torn open and a CAT excavator working at the right
A house coming down behind our site fencing. The machine work is a day or two — the permit is the calendar.

What it costs

What drives a Odessa quote

Scope of jobWhat drives the number
Small house, under 1,200 sq ftAccess, foundation type, and how close neighboring structures sit
Typical house, 1,200 – 2,500 sq ftSquare footage, slab versus crawl space, disposal weight
Large or two-story houseVolume, structural complexity, and tight-access handwork
Asbestos abatement, if foundHow much material and where it is — siding is cheaper than sprayed texture

Every demolition is quoted on site, free. Access, structure and what has to be protected move the number more than square footage does, which is why we walk it rather than price it down the phone.

About 35 minutes northeast via SR 54 or Gunn Highway — no bridge required, no toll unless the Suncoast saves real time. Close enough for single-structure jobs, open enough for big ones.

Book a free on-site estimate in Odessa

How it works

What a Odessa job looks like

  1. Asbestos survey

    A licensed inspector surveys the structure. Pre-1981 buildings require this before the municipality will issue a demolition permit.

  2. Disconnects and permit

    Power, water, sewer and gas confirmed disconnected by each utility, then the demolition permit is filed with your city or county.

  3. Demolish

    The structure comes down in a controlled sequence, with loads sorted as they separate — concrete, metal, wood.

  4. Foundation and slab

    Footers and slab are broken out and hauled to our yard for crushing, unless you are keeping the pad.

  5. Grade the lot

    The site is filled where needed and graded flat, ready for construction or sale.

Questions

House Demolition in Odessa — FAQs

How much does house demolition cost in Odessa?

It comes down to the structure and the access, not the ZIP code. On small house, under 1,200 sq ft, what moves the number is access, foundation type, and how close neighboring structures sit. What moves it in Odessa is lake access and the number of barns and outbuildings on an equestrian parcel. We walk the site and quote it, free.

Who disconnects the utilities?

The utilities do, and they must confirm it — a demolition permit will not close out on a house with a live meter. We tell you exactly what to order from Duke, the water authority and the gas company, and we sequence the job around their lead times.

Does the foundation come out too?

Usually yes — footers and slab are broken out, hauled to our yard and crushed into base material. If you are rebuilding on the same footprint we can leave a sound slab, though most new builds want it gone.

Can you prepare the lot for a new build?

Yes. Fill, compaction and crushed concrete base can run under the same contract, using material from our own yard, so the site is handed over as a buildable pad rather than a hole.