• Licensed C-11855 · CUC041521
  • Family owned since 1978
  • We own the transfer station
  • Serving 4 Tampa Bay counties

Largo, FL

Mobile Home Demolition in Largo

A mobile home is a demolition job and a disposal job at once — the structure comes apart into several different waste streams, and that is what drives the price. Our yard is about 15 minutes away, and we are licensed C-11855 and CUC041521.

Single/doublethe main price driver
Metalsrecycled to offset disposal
1–2 daystypical time on site

Inside the Largo city line a mobile home removal carries its own paper trail, title surrender and setup-permit closeout, and we run both alongside the demolition permit. The parks along Ulmerton and Seminole Boulevard date to the 1960s and 1970s, so the asbestos survey is a given, and the same crew handles a single unit one week and a whole-park clearout the next.

Largo gives us three steady job types: single mobile home removals and whole-park clearouts as land gets repositioned along Ulmerton, block-ranch teardowns on the west side, and commercial demolition where 1970s strip centers make way for redevelopment. It is our next-door market, so small jobs price well here.

Single-wide or double-wide is the first question, and it roughly doubles the work. After that it is the foundation type — piers, runners or a slab — the site access, and whether the utilities have been properly disconnected. Park lots with tight setbacks and carports on both sides take longer than an open rural parcel.

The structure separates into metal, wood, insulation and appliances. The frame and skin metal are recycled, which offsets a real part of the disposal cost — one reason a demolition contractor running its own transfer station can price this work more keenly than a general hauler paying gate rates on mixed loads.

Excavator working the last rubble pile on a cleared coastal lot behind a Sarnago & Sons site sign
The last pile on its way out. Every load is a round trip to our own transfer station on Keene Rd.

What it costs

What drives a Largo quote

Scope of jobWhat drives the number
Single-wide, open accessLength, additions, and how the utilities were run
Double-wideTwice the structure, plus carports and enclosed porches
Park lot with tight accessHandwork, smaller equipment, and protecting neighboring units
Slab or runner removalConcrete volume — recycled at our yard rather than tipped

Every demolition is quoted on site, free. Access, structure and what has to be protected move the number more than square footage does, which is why we walk it rather than price it down the phone.

Fifteen minutes from the yard with no bridge and no toll — Largo is the closest thing we have to a second home market. Short cycles mean a crew can knock down a house in the morning and have the pad broomed by end of day, with every load already back at our own transfer station.

Book a free on-site estimate in Largo

How it works

What a Largo job looks like

  1. Paperwork and permit

    Title retirement sorted, asbestos survey where the age requires it, and the demolition permit filed with the county or city.

  2. Disconnect utilities

    Power, water, sewer and gas verified disconnected by the utility before any work starts.

  3. Strip and separate

    Appliances pulled, metals separated, and anything salvageable set aside.

  4. Demolish and haul

    The structure comes down and goes out in sorted loads — metal one way, C&D the other.

  5. Clear the pad

    Piers, tie-downs, skirting and steps removed, and the site graded flat.

Questions

Mobile Home in Largo — FAQs

How much does mobile home cost in Largo?

It comes down to the structure and the access, not the ZIP code. On single-wide, open access, what moves the number is length, additions, and how the utilities were run. What moves it in Largo is whether the structure is a titled mobile home, a block ranch or a strip unit — three different jobs with three different disposal paths. We walk the site and quote it, free.

Do you remove the piers and pad too?

Yes. Piers, tie-downs and skirting always come out, and the slab or runners can go too — the concrete gets recycled at our own yard.

How long does mobile home removal take?

One to two days on site for most units once the permit and disconnects are in hand.

Do the utilities need to be off first?

Yes, and the utility itself must confirm the disconnect — a flipped breaker does not count. We tell you exactly what to arrange with each provider.